Tellier des Prés
Tellier des Prés – 12 MW Wind Farm

Project Overview
The Tellier des Prés project marks PerPetum Energy’s expansion into onshore wind as part of a broader multi-technology renewable strategy. The project consists of three wind turbines with a total planned capacity of 12 MW. Delivered under a full-scope model, development, investment, EPC and long-term O&M, it strengthens our ability to design and orchestrate integrated energy ecosystems combining wind, solar, storage and other electrification solutions. Tellier des Prés forms part of a growing Belgian wind portfolio supporting long-term renewable capacity development.
The Challenge
Expanding into wind energy with multiple wind farm developments across Belgium.
Our Solution
12 MWp wind farm with 3 turbines, currently in develoment.
Project Highlights
Results & Impact
Annual Production
30,000 MWh/year (projected)
CO₂ Avoided
13,500 tonnes CO₂/year